Chang’an Liangjiang No. 3 factory assembly
Customer case: Chang’an Liangjiang No. 3 Factory × Chongqing Hongguang Electromechanical Equipment Co., Ltd
Welding workshop sealing system mechanical pressure reducing valve upgrade project
Project background
Liangjiang and Sanfactories encountered technical bottlenecks when undertaking BYD’s CTB battery chassis project in 2025:
Hongguang Machinery Solution (Dual-Core Drive System)
(1) HG-MRV55 mechanical pressure reducing valve
(2) HG-HT200 manual smart glue gun
Implementation process
2025.02.20-03.08
Extreme temperature change test (-20°C~80°C)
2025.03.13
DNV GL certified
2025.03.14
The daily production capacity exceeded 18,000 pieces
Comparison of core results
Key indicators | Original system | After the renovation | Industry standard |
---|---|---|---|
Pressure stability | ±12% | ±0.4% | ±5% |
Glue ready time | 180 seconds | 30 seconds | 60 seconds |
Environmental adaptability | 15-35℃ | -20℃~80℃ | -10℃~50℃ |
“In the 80°C high temperature simulation test, Hongguang system Mechanical compensation mechanism The standard deviation of the output pressure is only 0.007MPa, and the error of sealant extrusion is < 0.3% for 72 consecutive hours. ”
—— Li Mingyang, Senior Engineer, Equipment Technology Department, Chang’an Liangjiang Factory